Pwd Dsr 2017-18 Maharashtra Online
The 2017-18 review was brutally honest about the hurdles:
During 2017-18, the PWD undertook numerous projects aimed at enhancing the state's infrastructure. This included the construction of new roads, bridges, and buildings, as well as the maintenance and repair of existing infrastructure. pwd dsr 2017-18 maharashtra
| Item Code | Description | Unit | Rate (₹) | |-----------|-------------|------|-----------| | PW-01.01 | Excavation in ordinary soil (upto 1.5m depth) | m³ | 185 | | PW-04.02 | Plain Cement Concrete (PCC) 1:4:8 (40mm aggregate) | m³ | 3,850 | | PW-07.10 | RCC M20 grade (1:1.5:3) excluding steel | m³ | 5,200 | | PW-09.30 | Reinforcement steel (Fe 500) cutting, bending, placing | MT | 7,850 | | PW-11.05 | Brick masonry (1:6 cement mortar) in superstructure | m³ | 5,100 | | PW-14.20 | Plastering 12mm thick (1:4) on brick wall | m² | 145 | | PW-18.05 | Vitrified tile flooring (600x600mm) | m² | 790 | | PW-22.30 | Painting – two coats of acrylic emulsion (interior) | m² | 48 | | RW-02.12 | Granular sub-base (GSB) Grade II | m³ | 1,020 | | RW-05.07 | Bituminous Macadam (BM) – 75mm thick | m² | 615 | | RW-07.09 | Dense Bituminous Macadam (DBM) – 50mm thick | m² | 570 | | RW-09.12 | Bituminous Concrete (BC) – 30mm thick | m² | 440 | The 2017-18 review was brutally honest about the
The 2017–18 schedule introduced specific percentage increases for works in specialized zones: placing | MT | 7